An easement for a pipeline or a power line stays with the land, so it binds you the day you close. You still own the strip, but the company that holds the easement decides what goes on it. Houses, shops, pools, and tall trees are usually out. Read the recorded easement before you plan anything.

The Easement Comes With the Land Whether Anyone Mentions It

An easement is a right to use part of someone else's land for a set purpose. The signs are usually easy to spot. You might see a long cleared strip cutting through the pines, short posts with a company name and a phone number, or steel towers crossing a pasture. The deed may also say the land is conveyed "subject to" an easement.

A recorded easement binds the next owner. The seller can't promise it away, and you can't fence it off after closing. We covered how recording works in whether a tract is landlocked. The same rule that protects an access easement in your favor holds a utility easement against you.

Alabama Power says so on its rights of way page. "Most easements are perpetual in duration." When a property is sold, "the easements remain in effect and are binding to the new owner."

Read the Recorded Document Before You Walk the Strip

Start at the courthouse. The cleared strip only hints at what the document says. Easements are recorded with the judge of probate in the county where the land sits. In Shelby County you can search the probate records online. Start with the current deed, then search the names of earlier owners. How to look up the deed walks through that search step by step.

When you find the easement, read it for four things.

  • Width. PHMSA, the federal pipeline safety agency, says a pipeline right-of-way width "can vary from as small as the width of the pipeline to 50-feet or more." Power line strips vary too. The document is where the number lives.
  • What the holder may do. Look for the right to cut trees, to come and go, and to add lines later.
  • What you may do. Some grants spell out allowed uses. Many say little.
  • Who holds it. Match the grantee on the paper to the company named on the markers or towers.

Old easements are easy to miss. Alabama Power's page notes that "most historical title searches are limited to 30-40 years." But "many transmission line easements were granted 75-100 years ago." It adds that easements "remain valid even if they are not shown on the title report."

So ask the closing attorney to look for the line by name, and ask the utility for its documents covering the parcel. A surveyor can show the strip on the map too, but only if you hand over the recorded easement. Do you need a survey explains why.

You Still Own the Strip, but the Holder Sets the Rules on It

The ground under the line is yours, and you can use it. The holder controls what sits on it.

For pipelines, PHMSA's briefing on pipeline rights-of-way says landowners often keep uses like "crops, grazing, parking and other uses." It also says "limitations on the landowner often include prohibitions against the installation of buildings, pools, trees and other physical structures." Each operator writes its own terms, so treat that as a general pattern and get the real list.

For power, Alabama Power publishes its list for transmission rights of way. Here is how it lands on the things a first-time buyer plans.

  • The house, the shop, or a shed. Permanent structures, including "buildings, houses, manufactured homes, sheds, gazebos," are on its list of encroachments it does not allow.
  • The driveway. Roads running along the strip are not allowed. "Perpendicular crossings may be considered," so a drive straight across it might work.
  • A fence. The location "must be approved and agreement signed," the fence "must be 25' from structures and guys," and it needs "a minimum 16' access gate."
  • A pond. Digging one is grading and excavation, which Alabama Power discourages and treats as needing engineer approval and insurance kept in force. Digging a pond covers the rest of that job.
  • Trees. Ornamental plants are allowed up to 10 feet tall. The easement also covers managing trees "either inside or outside the easement" that threaten the lines.
  • A septic field. Septic tanks and field lines are "rarely approved." Any septic system still needs a county health department permit and a soil evaluation on the actual parcel, so ask the holder before you order one.
  • Lawn, pasture, and food plots. Residential lawns, grazing, most farm use, and hunting food plots are on the allowed list.

Two lines on that page matter more than the list. Alabama Power treats "anything on the right of way that is not specified in the right-of-way document" as an encroachment. And before it allows any encroachment, a written "Tenant at Will" agreement has to be signed. Even an allowed use needs approval first. Rural electric co-ops and pipeline operators have their own rules, so get the ones for the company on your tract.

A Cleared Strip Shrinks the Acres You Can Use

The listing says 10 acres. Some of those acres may hold nothing but grass.

Take round numbers that describe no real line. A strip 100 feet wide running 1,000 feet across a tract covers 100,000 square feet. That's about 2.3 acres. On a 10-acre tract, nearly a quarter of the land can't hold a building. The real width is in the document.

Location matters as much as size. A line through the middle can split a tract in two. The best building spot may sit on the far side of a crossing the company has to approve. A line along one edge may barely matter. If you plan to divide the land later, splitting off acres explains how an easement eats into what each new lot can hold.

Tall towers don't mean easy power, either. Big lines on steel towers are usually transmission lines, which move power between substations. A house usually gets service from smaller lines along the road. Getting power to vacant land covers that side.

Maps and Markers Tell You a Line Is Close By

PHMSA runs the National Pipeline Mapping System Public Map Viewer, and it needs no account. It's a good first look. Know its limits before you trust it. PHMSA's page about the viewer says it "does not contain distribution or gas gathering pipelines." Distribution lines are the ones that carry gas to homes. It says "the minimum accuracy of geospatial data in the NPMS is +/-500 feet." Pipelines also drop off the county map when you zoom in closer than about 1:24,000. The same page has a tool that lists pipeline operators by state, county, or ZIP code.

Markers have limits too. PHMSA's briefing on pipeline markers says markers "indicate only the presence of a pipeline" and "can not be relied upon to determine the exact location." A strip can also hold more than one line. What a marker gives you is the operator's name and an emergency phone number.

LandScout tracks 18,187 undeveloped parcels in Shelby County as of the November 1, 2026 export, and you can see the Shelby County numbers on its page. Each parcel view flags a mapped transmission line that crosses the parcel or runs within 200 feet of it, with the voltage when the map has it. Those lines come from OpenStreetMap. LandScout doesn't map pipelines, so check the PHMSA viewer and walk the ground.

Call the Operator, Then Call 811 Before Anything Gets Dug

Before closing, call the company that holds the easement. Give it the parcel number and a sketch of where you want the house, the drive, the fence, and the pond. Alabama Power asks people to contact a local Right of Way Specialist and has an online request form. Its page says a representative will reply "within 5-7 business days." Get the answers in writing. Then make the purchase depend on them, the same way you would a perc test. Offer contingencies explains how.

Once you own it, Alabama's underground damage prevention law takes over. Section 37-15-1 says the chapter exists "to safeguard against injury and loss of life" and to protect buried lines. Section 37-15-2 counts digging, ditching, drilling, and grading with machines as excavation. Section 37-15-4 calls for notice "at least two but not more than 10 working days" before you dig.

Act 2026-255 amends the chapter on January 1, 2027, and keeps that window. The law excuses digging on your own land only when no one else has buried lines there. A pipeline easement means someone does.

Alabama 811 takes requests by phone or online, and it's free. The utilities mark their lines, and Section 37-15-2 expects the marks to be accurate to within 18 inches either side. PHMSA adds that an operator "may require that any excavation near its pipelines be monitored by qualified personnel."

LandScout's plans include the parcel view with transmission lines, road frontage, and the likely utility.

Before you sign, get the recorded easement and the operator's written answer in hand.