After the soil passes, the county health department issues a Permit to Install. An installer licensed by the Alabama Onsite Wastewater Board puts the system in. You may do it yourself only under a narrow exemption: your own property, a one- or two-family home that's your primary residence, and all the work done yourself, without help. The health department inspects before anything is buried. Nobody moves in until it issues an Approval for Use.
This picks up where our note on what "the ground won't perk" means leaves off. The soil evaluation came back good. Here is what happens between that report and the first night in the house.
The Permit to Install Comes Before the First Shovel
Alabama's septic rules are Chapter 420-3-1 of the Alabama Administrative Code, and the current version took effect February 13, 2023. Rule 420-3-1-.06 says no one may begin installing a system until the responsible person holds a valid Permit to Install from the local health department. For a private dwelling, the rules name the property owner as the responsible person. That's you.
In Shelby County, that office is the county health department. The Alabama Department of Public Health's Soil and Onsite Sewage page says its main objective is "to coordinate the onsite sewage program in the county health departments." So the county office takes the application, reviews the soil report, and issues the permit.
Rule 420-3-1-.13 gives the office 28 calendar days to issue the permit or tell you why it hasn't. A Permit to Install is good for five years from the day it's issued. If it runs out, you reapply, and the office may recheck the lot.
Who Designs the System Depends on What the Soil Allowed
The rules sort systems into two families. A conventional system is a septic tank, or a permitted treatment unit, feeding a drain field whose trenches sit entirely in undisturbed natural soil, no deeper than 60 inches. Rule 420-3-1-.04 says these "do not require an engineer design." The soil professional or the health department's specialist certifies the application, and the permit spells out the system.
Anything else is an engineered system. That covers mounds, drip irrigation, low pressure pipe, and advanced treatment other than a permitted treatment unit feeding a conventional drain field, among others. Rule 420-3-1-.09 also calls for an engineer in other cases. Those include a drain field area sloped more than 25 percent, a lot below the minimum size, and a site that rules out a conventional system. The engineer signs the design. Rule .06 says the installer has to consult with that engineer before any part goes in.
So read the soil report for the system type. If it supports a conventional system, there are fewer people on the job. Ask the soil professional which family your report lands in before you commit any money.
A Licensed Installer Puts It In, With One Narrow Exception
The Alabama Onsite Wastewater Board licenses the people who install, pump, and service septic systems. Under Section 34-21A-12, a conventional system takes a basic level installer license and an engineered system takes an advanced level license. Section 34-21A-16 says every licensee must carry a bond of at least $15,000 for a basic license and $30,000 for an advanced one. The board's site says it licenses "over 1200 persons," and its license search lets you look an installer up by name.
ADPH's Can I Live On This Lot? page puts it plainly: "Make sure that your system installer is licensed by the Alabama Onsite Wastewater Board (AOWB)."
Now the do-it-yourself question. Section 34-21A-10(a) lifts the license for owners working "on their own property with a one-family or two-family residence used as their primary residence." The catch is in the rest of the sentence. The owners must "complete all installation, cleaning, servicing, or maintenance themselves, without help, at their primary residence."
Read that slowly. Three conditions travel together. You own the property. The house is a one- or two-family home that will be your primary residence. And you do all the work yourself, without help. A hunting cabin or a rental house doesn't fit. The statute doesn't define "help," so ask the health department before a friend shows up with a mini excavator.
The exemption reaches the license and nothing more. Rule 420-3-1-.05 still says the installation "shall comply with the requirements and conditions of its permit." The permit, the inspection, and the setbacks all still apply.
Work You Put In Yourself Has Nobody Standing Behind It
A landowner we know of laid a mile of water line from the road to a house to save the contractor's fee. It worked. Then it broke somewhere underground, and the meter at the road kept running. The utility billed the leak, about $2,000. There was no contractor to call. Our note on where the water line ties in tells the rest.
A septic system is the same bargain with more at stake. A licensed installer is bonded, and answers to a board that can suspend or revoke a license under Section 34-21A-21, and reprimand or fine a licensee under Section 34-21A-25. When you install it yourself, none of that is behind the work.
Even a pro's work comes with no promise from the state. Rule 420-3-1-.69 says a permit and an Approval for Use are not "a guarantee or warranty, implied or expressed, that the system will function satisfactorily for any given period."
Nothing Gets Covered Until the Health Department Sees It
Rule 420-3-1-.08 is the inspection rule. No part of a system "shall be covered or used until the LHD is afforded an opportunity to inspect and any necessary corrections are made." Cover it early, and the health department can direct you to dig it back up.
The installer sets an inspection time with the county's environmentalist and calls by 9 a.m. that day to confirm the system will be ready. If a problem keeps the system from matching the permit, work stops until it's settled with the health department. Within three business days of finishing, the installer turns in Form CEP-5 certifying the work. On an engineered system the engineer certifies it too, on Form CEP-6, under Rule 420-3-1-.34.
The rule gives one bit of slack. If weather or workload keeps the inspector from arriving within 30 minutes of the agreed time, the health department may let a licensed installer cover the system. The rule names licensed installers for that, so an owner doing the work should ask how the office handles that day.
The Move Waits on the Approval for Use
The Approval for Use is the health department's sign-off to start using the system. Rule .04 defines it as issued "after all conditions of these rules and permits are satisfied." Rule .08 says a system "shall not be used" until that approval is issued. Rule .05 says no one may occupy a building as a dwelling unless it has an approved sewage system.
That fixes the order: permit, install, inspect, paperwork, approval, and then the move. Some lots add a step. Rule 420-3-1-.36 says any recordings the rules call for, such as a covenant that runs with the land for certain engineered systems, must be done first. If you planned to live in a camper during the build, our camper note covers that question.
The septic approval also stands apart from the building side. Rule 420-3-1-.68 says the health department's approval doesn't imply approval by a city, county, or any body with planning or zoning authority. Our note on building permits in rural Alabama covers that side.
Setbacks Decide Where the House, Well, and Drain Field Go
The drain field can't go just anywhere the soil passed. Rule 420-3-1-.65 puts the minimum distances in Table 4. The drain field sits at least 100 feet from wells and potable springs, and the tank at least 50 feet. The drain field stays 50 feet from surface water or an intermittent stream, and 5 feet from the property line and the house foundation. Rule .65 also says no water, electric, phone, or gas line may cross over or under a drain field pipe.
The well distance eats the most ground. A 100-foot circle around a well covers about seven-tenths of an acre. Rule 420-3-1-.10 also wants room for a full reserve drain field, sized to match the first one, plus every setback. Our note on drilling a well covers the well side.
In LandScout's export of November 1, 2026, the median scored Shelby parcel is 2 acres. On a lot that size, the house, the driveway, the drain field, the reserve, and the well all compete for the same good soil. The soil starts out mostly good: 94.4 percent of scored Shelby parcels with a mapped drainage class sit on soil that drains well enough for a drain field. You can see the Shelby County numbers beside the flood and slope figures. That is a screen. Your soil report decides.
So sketch the lot before the installer comes. Mark where the soil was tested, put the well 100 feet away, then place the house. Plan limits, including the free tier, are on the pricing page.
Hire a licensed installer, or meet every word of the exemption and own the result. Either way, the health department sees it before the dirt goes back.